Since everyone else have reserved the chicks and the jetpack, may I have the big black guy?
I do wonder how much that thing would cost, though. The jetpack, of course. It looks expensive.
MS Watersports GmbH Germany is now ready with their production line. Shipments should begin by the end of November 2010.
MSRP is 129.000,00